Renewal of trench system

 Renewal of the trench system in Lübbenau/Spreewald by SGL.

SGL_Spezialbauleistungen_Tiefbau_2.png

Work on the Lübbenau trench system

In 2015, SGL carried out extensive work on the Lübbenau ditch system. The surface water between Boblitz and Lübbenau was extensively renewed so that the water can once again flow away unhindered. The ditches were dredged, straightened and restored over a length of 1,500 meters.